Reduction of Total Petroleum Hydrocarbons and restoration of vegetation.
TPH of the soil at the start was 65,000 ppm and was reduced to 26,000 in 20 days time and before end of three months the TPH values in the soil was reduced to 650 ppm with no tainting of the grass. Further, the area was found to support healthy growth of grass and other vegetation indicating no residual toxicity in the soil and AgroRemed helped restoration of the soil to its condition before the spill. The project was approved for closure by the DEQ.